Wall Light Fixture Test

[masterslider id=”105″]

Description

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Fusce mauris risus, cursus vitae tristique in, blandit vitae quam. Nam ex elit, sodales id tortor sit amet, feugiat vestibulum enim. Sed faucibus vehicula turpis, id finibus odio porttitor eget. Cras a porttitor tortor. Mauris sit amet diam ex. Integer est dui, dapibus nec magna eu, tempus lobortis eros. Ut faucibus nisi non nunc commodo, in aliquet magna tincidunt. Sed a laoreet lectus, sed sagittis turpis.

Location:

New Haven, CT

Year:

2002

 

 

1 of 6
2 of 6
3 of 6
4 of 6
5 of 6
6 of 6

[masterslider id=”113″]

Verre Float
Profilit Glass
Firelit Glass
Glass – Thumb
Tiling
Glass

Graham Avenue Townhouse

Location:

372 Graham Ave.

Brooklyn, New York 11231

Year:

2006

Description

This 5,000 sf townhouse is located in the Williamsburg section of Brooklyn, a rapidly developing New York community consisting largely of artists and young professionals. Martin R. Tomczyk was originally selected only as the design architect for this project. However, it soon became apparent during the early stages of this project that the selected contractors were unable to properly execute the design or maintain the proposed budget. In response, Martin R. Tomczyk established MRTA Design Construction to serve as contractor and project manager with the help of the consulting engineer. This project was built for mixed-use; comprising of one commercial level and two residential floors with resident access to a rooftop garden and second floor rear terrace. This project required demolition of an existing wood frame structure in multiple stages, excavation of basement and considerable restructuring of the preexisting foundation. The curtain wall and imported windows were customized to give the facade its particular form. The curtain wall retracts at its peak back into a skylight. The rear facade was made from zinc tinted custom corrugated sheet metal. All the concrete facade elements were custom fabricated for structural integrity by MRTA. The urban custom stone facade was developed to contrast the glass curtain wall which floods the structure’s interior natural light. The intention of these two elements was to create a balanced juxtaposition between the heavy and the light, the transparent and the opaque. The size and scale of the facade was designed with the intent to compliment the human scale and the existing surrounding environment.

Services

•  Construction, fabrication, installation, construction management
•  Designed collaboration, consulting, engineering
•  Mockup models full scale & testing
•  Furniture mockups
•  Material Samples
•  Shop drawings, 3d models
•  Landmark Preservation drawing presentation submittals and mockups

Construction Work Process

Geier Residence

Location:

Spring Street

Manhattan, New York

Year:

2005

Description

Living Room / Bedroom:
Three (4 ft x 8 ft) bamboo sliding panels
Custom 3 tier closet with mirror & above shelving
Kitchen:
New leveled wood flooring throughout
Custom bamboo kitchen cabinetry
Custom metal countertop subway tile backsplash
Stainless steel appliances
Halogen lighting on dimmers
Bathroom:
Custom sliding door with frosted glass
Graphically designed floor tiles (graphic artworks by owner)

Services



Construction Work Process

Hadfield Residence

Location:

1000 5th Ave

New York, NY 10028

Year:

May 2016

Description

Master Bathroom – Guest Bathroom – Kitchen
Three types of ceramic floor tile
Three color glass tile in varied transparency & color
Custom built vanity with stone & mirrored recessed wall cabinet
Imported Italian & German plumbing fixtures
Imported accessories

Services

•  Consulting, fabrication & installation design / engineering
•  Project scheduling

Construction Work Process

Fienberg Residence

Location:

Mercer Street

Manhattan, New York

Year:

2005

Description

Two types of imported marble floor tile
Custom built polish chrome closet frame with acid etched mirror
Imported Italian & German plumbing fixtures
Primary – Halogen lighting
Secondary – Suspended decorative lighting

Services



Construction Work Process

Testing